Zhangjiagang HuaDong Boiler Co., Ltd.

होम
उत्पाद
हमारे बारे में
फैक्टरी यात्रा
गुणवत्ता नियंत्रण
हमसे संपर्क करें
एक बोली का अनुरोध
कंपनी समाचार
होम उत्पादBoiler Steam Drum

Steel Power Plant CFB Boiler Steam Drum / High Pressure High Temperature Drum

Steel Power Plant CFB Boiler Steam Drum / High Pressure High Temperature Drum

    • Steel Power Plant CFB Boiler Steam Drum / High Pressure High Temperature Drum
    • Steel Power Plant CFB Boiler Steam Drum / High Pressure High Temperature Drum
    • Steel Power Plant CFB Boiler Steam Drum / High Pressure High Temperature Drum
  • Steel Power Plant CFB Boiler Steam Drum / High Pressure High Temperature Drum

    उत्पाद विवरण:

    Place of Origin: China
    ब्रांड नाम: HD Boiler
    प्रमाणन: ISO9001 , SGS , TUV , ASME , EN
    Model Number: Steam drum

    भुगतान & नौवहन नियमों:

    Minimum Order Quantity: 1 set
    मूल्य: Negotiable
    Packaging Details: Seaworthy Packing
    Delivery Time: 50~100 Days
    Payment Terms: L/C, T/T, Western Union
    Supply Ability: 400 Tons per month
    अब से संपर्क करें
    विस्तृत उत्पाद विवरण
    Medium: Gas/Water Condition: New
    HS Code: 3215960855 Type: Natural Circulation / Once Through
    Trademark: HD BOILER Material: Carbon steel,Alloy,Stainless steel
    Color: Customization Thickness: 10mm - 100mm

     Environmental Power Plant CFB Boiler mechanical Steam Drum High pressure High temperature drum


    Description
     
    It is the main part of the boiler ,in which steam and water separates. Inside the boiler, saturated steam is separated from water and then directed into super heating tubes for further temperature increase.
    Water separated from steam will combine with the incoming boiler feed water and then re-enter the down comers to repeat the cycle. Thus the boiler drum acts as a steam separator.
     
    Features
    1. Chinese Famous Brand.
    2. Premium Quality, Competitive Price.
    3. Fast Delivery, Excellent After-sale Service.
    4. Certificate ISO9001, ASME, ISO14001, SGS.
    5. Compact structure, easy to install.
    6. The exhaust gas passes through the force convection tube bundle, improving the efficiency of the boiler.
     
    Classification

    Pressure Low Middle High Superhigh
    Inner diameter(mm)

    800-1200

    1400-1600

    1600-1800

    1600-1800
    Thickness(mm) 16-25 32-46 60-100 80-100
    Material Carbon steel Carbon steel & Alloy steel Carbon steel & Alloy steel Alloy steel
     

     
    Working Progress
     
    The separated steam is drawn out from the top section of the drum and distributed for process. Further heating of the saturated steam will make superheated steam normally used to drive a steam turbine. Saturated steam is drawn off the top of the drum and re-enters the furnace in through a superheater. The steam and water mixture enters the steam drum through riser tubes, drum internals consisting of demister separate the water droplets from the steam producing dry steam. The saturated water at the bottom of the steam drum flows down through the downcomer pipe. 
     
    Sectional drawing
     
     
    Steel Power Plant CFB Boiler Steam Drum / High Pressure High Temperature Drum
     
     
    Certificate
     
    Steel Power Plant CFB Boiler Steam Drum / High Pressure High Temperature Drum
     
    Company Introduction

     

    Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.

     
    1. Fabrication area of 200,000 square meters
    2. 150 Engineers
    3. 600 Coded welders
    4. 60 Licensed Inspectors(NDT Level-III instructors)
    5. Class-A Licenses for Design and Manufacture Boiler
    6. ISO 9001:2008 Quality System
    7. ASME Certificate of Power Boilers
    8.ASME 'S','U' and NB stamp authorization
     
    Design and Manufacturing capacity
     
    1. Two automatic coiler production lines
    2. Hot bending to minimum bending radius 0.6D
    3. Membrane wall tube bending , with horizontal and vertical panel bending machines
    4. Panel fabrication for up to for 1000MW power plant boilers
    5. Fabrication of CFB Boiler Cyclone Separators
    6. Fabrication of Header to Chinese standards(GB), US standards (ASME), or EU standard (EN)
    7. Broad range of heat treatment equipment including 10 furnaces, offering normalizing and tempering
     
    Steel Power Plant CFB Boiler Steam Drum / High Pressure High Temperature Drum
     
    Steel Power Plant CFB Boiler Steam Drum / High Pressure High Temperature Drum
     

     

    सम्पर्क करने का विवरण
    Zhangjiagang HuaDong Boiler Co., Ltd.

    व्यक्ति से संपर्क करें: Ella

    हम करने के लिए सीधे अपनी जांच भेजें (0 / 3000)

    अन्य उत्पादों